Composite Deck Replacement · Full Tear-Down & Rebuild
Built to
Last.
Full demo of a failing deck and a ground-up rebuild — pressure-treated substructure, composite decking, composite fascia skirting, white vinyl rail system, black aluminum balusters, and composite stair treads.
The Old Deck
The existing deck had reached end of life — rotted boards, a failing substructure, and a rail system that no longer met code. Full tear-down and rebuild. No patching. Start clean.
Substructure to Surface
New pressure-treated posts, beams, and joists installed to current code. Composite boards laid with hidden fasteners for a clean surface. Rail posts set into the frame. Stairs rebuilt with composite treads.
The Completed Deck
A deck built to outlast the house it serves. Clean lines, no exposed fasteners, structural rail system, and composite materials throughout that require nothing but an occasional wash.
Completed Composite Deck
From a rotted, failing deck to a composite-built outdoor space built to last decades without painting or staining.